Skip to content

HVAC contractor in Ras Al Khaimah · Est. 2008 The comfort you feel. The engineering you don’t see.

Complete HVAC expertise, from design and supply to installation, commissioning and maintenance.

Illustration of a modern office building at dusk, cut away to show its air-conditioning ducts, rooftop units and airflow

Our work

Projects from Ras Al Khaimah to Dubai

Ministry buildings, a general hospital, schools, mosques and malls in Ras Al Khaimah, Umm Al Quwain, Sharjah and Dubai.

See all projects

Systems

Systems we install

From central chilled water plants to single split units, chosen to suit the building and how it is used.

  • Chilled water systems
  • Air handling units (AHU)
  • Fresh air handling units (FAHU)
  • Packaged units
  • VRF systems
  • DX systems
  • Ducted split units
  • Decorative split units
  • Split units
  • Ventilation fans
  • Smoke management systems

Sectors

Buildings we work on

Our project list covers public buildings, healthcare, schools, mosques, malls, hotels and homes.

  • Government & public services

    Ministry buildings, a civil defence station and post offices.

  • Healthcare & care centres

    A general hospital and autism care centres.

  • Education

    RAK Academy school campuses and a UAE model school.

  • Mosques & religious institutions

    Mosques for Awqaf and private clients, and a Quran foundation.

  • Malls & showrooms

    Shopping malls and car showrooms.

  • Hospitality

    Twin hotel towers.

  • Transport

    A building for Emirates Transport.

  • Residential & commercial buildings

    Residential and commercial buildings, from G+M+3 to G+M+13.

  • Industrial

    A factory building, plus maintenance for industrial establishments.

  • Private villas

    More than 20 private villas.

Equipment

Brands we supply and install

We supply and install air-conditioning equipment from established manufacturers, including:

  • Mitsubishi Electric
  • Carrier
  • Hitachi
  • Trane
  • LG
  • York

Brand names are trademarks of their owners and are listed for reference.

How we work

From the first drawing to the maintenance visit

Five steps, handled by one company.

  1. 01

    Design

    We study the building and its use, calculate heat loads to ASHRAE methods and select the system. Where a consultant has already designed it, we work to the approved design.

  2. 02

    Supply

    We source equipment from established manufacturers and fabricate ductwork in our own workshop.

  3. 03

    Install

    Our teams install equipment, ductwork and pipework on site, in coordination with the main contractor and under the consultant's supervision.

  4. 04

    Commission

    We test and commission each system before it is handed over.

  5. 05

    Maintain

    An annual maintenance contract keeps the system serviced, and our on-call team attends breakdowns.

Reviews

What clients say

Reviews from our Google listing.

4.7

Our rating on Google

Read all reviews on Google
  • “One of the best AC contractors”

    Woseem Sajjath · Google review

Planning an HVAC project or a maintenance contract?

Send us the drawings or a short description. We will reply with the next steps and a quotation.

Contact Tabreed

Visit or call our office in Khuzam

Tabreed Electro Mechanic Contracting, Khuzam St, Khuzam, Ras Al Khaimah.

Open in Google Maps